SAP projects
period 05/2021 - today
industry: chemicals
Project:
platform owner of global ERP system of the company (>10.000 user).
Responsible for the complex S/4 Landscape (ERP, EH&s, MDG,EWM)
Environment SAP S/4 2020 - 2023, Linux, SAP HANA DB, virtualised in AZURE
responsible in team for all
connected SAP systems like Master Data, EHS, or middleware systems SAP
Cloud connector, SAP data service agent, SAP'Router etc.
check, steering and review of
all relevant tasks like system copies, client copies etc. approval,
release and review of changes in CHARM and service now for SAP and
corresponding systems.
contact for all questions regarding basis and landscape architecture.
period 05/2020 - 05/2021
industry: chemicals
Project: Main responsible SAP Basis for R/3 > S/4 greenfield migration of the global ERP system >10.000 users.
Environment: SAP S/4 HANA, NW 7.5, Linux, Oracle 12 SAP HANA DB
Consulting and steering of
internal and external partners and service providers for architecture,
sizing and running the systems. for GOLive relocation from backup to
Hot side in Azure environment. Responsible for stability, integrity and
performance before, during and after GoLive.
Steering and review of basis tasks like system copies, client copies, mock loads etc.
responsible contact for all project relevant questions regarding the landscape architecture.
period 10/2018 - 05/2020
industry: life sciences
Project:
Main responsible Global Integration Manager for a complex SAP landscape (> 130 systems, >70.000 users).
Environment: SAP ABAP 4.0 – NW 7.5, Linux, Oracle 11, SAP HANA DB 1xx.x
Manage
implementation of basis related customer requirements by analyzing,
consulting and coordinating the activities and initiating the
appropriate changes. Steer and control involved internal and external
resources and providers to ensure stability and integrity of the
affected systems.
Manage SAP Basis and cross function changes (ChaRM) and ensure the provision of the Systems within the customer-agreed SLAs.
Main
contact to customer/business for consulting regarding all platform
related tasks in several projects (upgrades, mergers, carve outs).
period 01/2017 - 09/2018
industry: life sciences
Project:
responsible in team for a global SAP landscape (> 130 systems, > 70.000 users)
Environment: SAP ABAP 4.0 – NW 7.5, Linux, Oracle 11, SAP HANA DB 1xx.x
In
Team responsible for several ERP Systems in landscape, steering of
tasks of internal and external suppliers. Main contact to
customer/business for consulting regarding all platform related tasks.
Ensuring
delivery of agreed services and performance of overall operation
services of the SAP Systems. Ensuring adherence to operation guidelines
regarding ICS conform delivery of service.
Lead sub-projects for technical upgrades. Strategical consulting for
landscape design in projects.
period 11/2015 - 12/2016
industry: seeds
Project:
responsible in team for a global SAP landscape including several systems (> 30, > 20.000 users)
Environment: SAP ABAP 4.0 – NW 7.4, Linux, Oracle 11, SAP HANA DB 85.x – 1xx.x
Third
level support, all SAP Basis issues, in Team responsible for EHP
upgrade of largest SAP ERP System in landscape (>12.000 users),
outsourcing and steering of providers, main contact to
customer/business for consulting regarding all platform related tasks.
period 09/2010 - 11/2015
industry: chemicals
Project:
1 1/2 years exclusive responsible for running a virtualized 3 tier
production critical ERP Landscape (7 x 24) connected to a 2 tier BI
Landscape with Portal. Team responsibility for two other ERP Landscapes
located in India and USA.
Environment: ECC 6.0x, Netweaver 7.0x, WIN2003 / 2012, Oracle 10 / 11, Citrix, VMWare 4.x/5.5
1st
and 2nd level support regarding all SAP Basis issues. Implementing SAP
Notes, patches, kernel updates, maintaining transport management
system.
SAP archiving,
providing data for external use via DART. Heterogenous and homogeneous
system copies with NetApp Flex Clone technology and SAP software
provisioning manager.
Granting
permissions and maintaining access roles with profile generator.
Managing the Windows domain of the SAP Landscape including own printers
and print servers running special software for label printing of
hazardous materials.
Maintaining
and monitoring primary and secondary (backup) storage systems.
Developing, improving and implementing von concepts and scripts for
automation processes of syncing and reorganizing data.
Coordinating
external consultants and implementing and connecting 3rd party systems
(e.g. EDI, Seeburger, Lobster, Ecovision, Open Text, Atos, Ebsoft,
Retarus, WWI/EHS etc.)
Projectlead:
exchange of EMC storage system with NetApp FAS 3240 / FAS2040
Set up SAN infrastructure containing two clustered NetApp 3240 with NetApp 2040 mirror system.
Implementing NetApp specific technologies (e.g. thin provisioning, Flex
Clone etc). Replacing WIN file servers with CIFS services.
Substitution
of the old backup solution with NetApp technologies (snap repository,
SMSAP, Snap Drive, Snap Mirror) displacement of the old oracle shadow
DB with Snap Mirror, improving the Business Continuity Processes for
SAP an NON SAP Systems.
Virtualizing
ERP productive system and backup server with upgrade backup software
and restructuring the backup to tape concept using NetApp software.
Renewal tape library, domain controllers and ESX hosts thereby update VMWare to 4.1.
Part responsibility:
founding new datacenter NASA:
Setup Storage system similar to EMEA with connecting to EMEA’ s backup storage via Snap Mirror.
Recreating the 3tier ERP and connected 2tier BI SAP landscape in ASK environment from DB Exports from parent company.
Technical installation and connection of 3rd party systems like WWI, EHS Expert, Retarus,
Lobster etc.
period 02/2010 - 09/2010
industry: logistic
project:
running
a huge, complex, partial high available (HACMP) SAP system landscape
(> 100 instances in a Datacenter including Components R/3, BW/BI,
CRM, ECC, ERP, XI/PI, APO) on Basis Releases Net Weaver 7.0 on DB2 9.x
and AIX, Linux and Windows.
SAP
Basis administration and problem management (2nd and 3rd level
support). Analyzing customer requests regarding feasibility. Technical
implementation, installation and migrations.
documentation containing checklist, standard operational procedures and user manuals.
period 03/2006 - 12/2009
industry: chemicals / pharmaceuticals
project:
development
of concepts, processes and new products for the BAYER Global Datacenter
Germany for SAP systems Releases 4.6B to Net Weaver 7.0 running on
oracle databases 9 and 10 and AIX and RHEL4 as operating systems.
Optimizing
direct database access to oracle DB's running SAP systems regarding
efficiency and security aspects by using a second oracle DB as a
gateway.
Migration of a huge, complex landscape from AIX to RHE Linux using NFS and a shared root environment.
Analyzing the requirements regarding feasibility, developing in
cooperation with customer the requirement specifications and the
operational concepts.
optimizing processes in cooperation with Run and Product Management.
technical
implementation, installation and migration of the new landscape and
optimize it regarding the existence scripts and automation procedures.
Man in charge of single script tests and integration tests also optimizing test procedures and documentation.
Creating
presentations, SOPs, checklists and user manuals in English language
for global use, handing over to Run and train the employees with
created training documents.
period 07/2005 - 02/2006
industry: chemicals / pharmaceuticals
project:
running
a huge, complex, partial high available (HACMP) SAP system landscape
(> 230 instances in a Global Datacenter including Components R/3,
BW/BI, CRM, ECC, ERP, XI/PI, APO) on Basis Releases from 3.1I to
Net Weaver 7.0 on oracle 8/9/10 and AIX, Win2000, Win2003, HP-UX,
Linux.
SAP Basis administration and problem management (2nd and 3rd level support).
Analyzing customer requests regarding feasibility. Development and maintenance of processes, procedures and products.
Technical
implementation, installation and migrations. documentation containing
checklist, standard operational procedures and user manuals.
Optimization and maintenance of the procedures during the globalization
project regarding the ITIL basics.
period: 06/2004 - 07/2005
industry: chemicals / pharmaceuticals
project:
responsible for SAP system landscape ( 35 instances) releases 3.1I to 4.6C, running on oracle 8 / 9 on WINDOWS NT / 2000, AIX.
Problem
Management, SAP installations, DB migrations, update, patching,
monitoring. Migrating the existence SAP systems from WIN to AIX via DB
Export / import, homogeneous system copies via backup, restore (sap
backup, TSM).
period: 09/2001 - 05/2004
industry: energy supplier
project:
responsible for the system landscape of the biggest remote customer of IBEX AG.
Installations,
migrations, system copies, client copies, updates, DB migrations,
release changes, monitoring, performance analysis and optimizations on
SAP system landscape containing R/3 (4.0B - WEB AS 620), BW, Solution
Manager 3.0, running on oracle 7/8/9 and Compaq Tru64.
period: 07/2001 - 04/2003
inhouse
project:
Implementation of an WIN2000 domain for remote administration of customer SAP systems.
Installation,
configuration and documentation of WIN domain controller, RAS-server
and the complete PC landscape for internal use and remote
administration to customer systems using different VPN clients, PCDuo,
PcAnywhere, VNC, putty, Xterm etc.
Planning, patching and documenting the ISDN and TCP/IP Resources after department move.
period: 11/2001 - 12/2003
several customers
short projects:
Installations,
DB migrations, updates, patch implementation, performance analysis,
release changes, system copies, client copies of SAP systems, databases
and operating systems, regarding WIN NT / 2000 / 2003, Tru64 4.0F -
5.1A Oracle 7.x - 9.x SAP 3.1I - WEB AS 620.